SmartDoc · Use case · Extract

Pull every line item and rate out of a tender in minutes.

Your costing team has a week to price a tender and the first two days go on retyping the schedule of rates, building list, and manpower plan into Excel. SmartDoc reads the tender, pulls every line item, quantity, and rate into a structured sheet, and lets your team spend the week pricing instead of transcribing.

85%
Time Reduction
4 hours to 30 min per tender
99%
Extraction Accuracy
vs 90% manual transcription
Up to 1,000
Line Items Extracted
From single FM tender document
$10K+
Annual Savings
Per 8 tenders processed monthly

Metrics shown are illustrative estimates based on typical use cases. Actual results vary based on document complexity, volume, and existing processes.

Here is what it actually looks like.

Upload a tender. SmartDoc extracts the schedule of rates, building details, manpower requirements, and site summary into a structured cost model ready for Excel.

SmartDoc · Tender Financial Extraction
Tender Document PDF
100%
Export to Excel
SINGAPORE POLYTECHNIC
Cleaning Services Tender - Schedule of Rates
Ref: SP/FM/2025/001 | Facilities Management Services
Schedule of Rates - Part A: Waste Disposal Services
ItemDescriptionUOMQtyRate ($)
1(a)Provision of skip tank for collection & disposal of bulky rubbish (weight ≤ 3 ton)No1450.00
1(b)Provision of skip tank for collection & disposal of bulky rubbish (weight > 3 to 5 ton)No1650.00
1(c)Provision of skip tank for collection & disposal of bulky rubbish (weight > 5 ton)No1750.00
2Provision of "Sanibins" sanitary disposal bins - air-tight, moulded plastic with disinfectant linerPer bin/mth20025.00
Schedule of Rates - Part B: Floor Maintenance
ItemDescriptionUOMQtyRate ($)
3Quarterly stripping and polishing of vinyl floor tilesPer sqm315,398-
4Annual high-pressure washing of external covered walkwaysPer sqm50,000-
5Bi-annual deep cleaning and sealing of terrazzo flooringPer sqm12,500-
Schedule of Rates - Part C: Pest Control
ItemDescriptionUOMQtyRate ($)
6Weekly general pest control treatment - all buildingsPer week52-
7Monthly rodent control and monitoring programPer month12-
8Ad-hoc termite treatment (upon discovery)Per treatment1-
Schedule of Rates - Part D: Ad-hoc Labour
ItemDescriptionUOMQtyRate ($)
9Additional cleaner/floater - weekday hours (8am-6pm, Mon-Sat)Per hr (min 4)1-
10Additional cleaner/floater - evening hours (6pm-12mn, Mon-Sat)Per hr (min 4)1-
11Additional supervisor - weekday hours (8am-6pm)Per hr (min 4)1-
12Additional cleaner - Sundays and Public HolidaysPer hr (min 4)1-
Annex A: Building Details
S/NZoneCodeBuilding NameGFA (sqm)FloorsToilets
1EASTADMINAdministration Building6,138.63715
2EASTLIBLibrary7,380.5569
3WESTCCConvention Centre4,543.4168
4EASTT10ATeaching Block 10A19,899.72725
5WESTT11BTeaching Block 11B13,167.49730
... 88 more buildings (93 total)
Annex B: Manpower Requirements
Role / PositionQtyShift HoursFrequency
Operations Manager18am-6pm weekdays, 8am-1pm (2 Sat/mth)Daily
Assistant Managers3Shift arrangement per deployment planDaily
Admin Executive1Office hoursDaily
Supervisors1Full-time during cleaning hoursDaily
Multi-Skilled Cleaner / Machine Operator1Shift arrangementFull-time
... 17 more roles (22 total)
Site Summary
Site NameSingapore Polytechnic
Total Gross Floor Area315,397.64 sqm
Total Floors300
Total Toilets1,665
Total Sinks1,218
Total Buildings93
Document Summary
268 SOR Items | 93 Buildings | 22 Roles | Ready for Extraction

* This mockup is for illustrative purposes only. The actual SmartDoc interface and features may differ.

Stop manual data entry for your pricing models.

Turn hours of spreadsheet work into minutes. SmartDoc extracts tender cost data straight into the Excel pricing models your team uses, eliminates transcription errors, and accelerates your bid response.